Bokh Health Center Renovation and Dry Latrine Construction
NAHDA Construction Firm completed the renovation of the stabilization block and construction of a dry latrine at Bokh Health Center in Ethiopia’s Somali Region. The works included internal partitioning, ceiling replacement, ceramic floor and wall finishes, windows and doors, electrical installation, fascia boards, gutters, mosquito-net protection, painting, drainage, water connections, handwashing facilities, an accessibility ramp and entrance steps.
The dry-latrine component included excavation, reinforced-concrete foundations and slabs, blockwork, columns and beams, roofing, plastering, metal doors, ceramic finishes, sanitary fittings, ventilation, electrical installation, an elevated water tank, a washing point and associated water connections. The completed facilities were inspected and handed over in 2024.