Rehabilitation of Hand-Dug Wells and Institutional Latrines

Nahda Construction Company is proud to showcase the successful completion of the “Rehabilitation of Non-Functional Hand Dug Wells and Institutional Latrines in the Somali Region” project, a vital intervention to restore access to safe water and sanitation for vulnerable communities.

Project Summary

This high-impact project was designed to tackle critical WASH (Water, Sanitation, and Hygiene) infrastructure gaps in the Somali Region. Our focus involved the full technical rehabilitation of key water sources across multiple sites, including the Fafan sites, complemented by necessary upgrades to institutional sanitation facilities.

Scope of Work: Hand Dug Well Rehabilitation

Our team executed comprehensive rehabilitation on seven (7) non-functional Hand Dug Wells (HDWs) in the Fafan sites, ensuring their return to full operational capacity as sustainable and safe water points.

The detailed scope of work included:

Assessment and Excavation: Detailed assessment of existing well structures, followed by necessary excavation work to ensure well stability and depth clearance.

Well Cleaning and Backfilling: Comprehensive washout and backfilling operations to secure the well structure and prevent contamination.

Installation of Pumping Systems: Installation of new and durable manual pumping systems to provide reliable water access. This involved meticulous pipe connection and installing.

Well Location Well Depth Well Diameter Key Materials Used (per well)
Garbaha 1 (around Durdur factory) 40 meters 1.2 meters 10 PVC, 10 siiq, 2 pin, 4 bush bearing, 1 pump
Qurac Matana 1 30 meters 1.2 meters 6 PVC, 6 siiq, 2 pin, 4 bush bearing, 1 pump
Cadaade 30 meters 1.2 meters 10 PVC, 10 siiq, 2 pin, 4 bush bearing, 1 pump, and cover/hand
Bushman 30 meters 1.2 meters 4 PVC, 4 siiq, 2 pin, 4 bush bearing, 1 pump
Duration Brief Description of main deliverables Status Client

April 24 2025 —- June 24 2025

Rehabilitation of Non Functional Hand Dug Wells and Institutional Latrines in the Somali Region

Closed

Ethiopian Red Cross Society

Client / Funded ByEthiopian Red Cross Society
ContractorNAHDA Construction Firm
LocationSomali Region, Ethiopia
DurationApril 24, 2025 – June 24, 2025
StatusCompleted